How do you install ONDO and how much time does that process take?
The installation and configuration of ONDO takes between 1 and 3 days, depending on what extra equipment would need to be installed, as well as the size of your farm. The installation of the ONDO controller is only done by an authorized ONDO solutions Ltd. technical expert.